Hot tapping, line stopping and pipe freezing on live systems — so your plant keeps running while we work. Family-run specialists trusted across the UK and internationally.

New branch connections drilled into live pipelines under pressure.

Isolate a section of pipe while the rest of the system keeps flowing.

Temporary ice plugs stop flow for maintenance with no drain-down.

Installation, alteration and maintenance of industrial pipework.
Tell us the line size, pressure and medium. We assess the isolation method — same day for emergencies.
Fixed quote with full RAMS. You know the cost, the method and the timeline before we arrive.
Hot tap, line stop or freeze performed on the live system. Your plant keeps running throughout.
Completion fittings installed, system verified, full documentation handed over. No return visits needed.

New branch connection drilled under pressure at a fuel terminal, with zero downtime for the operator.

Twin line stops isolated a trunk main section for diversion works while supply stayed live.

Ice-plug isolation allowed valve replacement on a clean steam system with no production loss.
Same-day response on quotes. For urgent isolations, call — the team answers around the clock.